top of page

EAST CENTRAL HIGH SCHOOL ARENA RENDERINGS

Tulsa, OK
SQUARE FOOTAGE: 50,500 

BUDGET: $12M

YEAR COMPLETED: 2022

PROJECT STATEMENT:
East Central High School was originally built during the Cold War to double as a fallout shelter. With curved walls and few windows, the existing campus challenged the design team to create an arena complementing the existing structure while offering an engaging atmosphere for students and educators. The design utilizes a steel structural skin with polycarbonate and insulated metal panels that provide ample natural daylighting. The new facility includes an 1,100-seat arena, concession stand, auxiliary gym, study room, conference room, athletic offices, sports medicine and training rooms, and locker rooms for three different athletic programs.

LINKS FOR ADDITIONAL INFORMATION:
​
View photos of this project


Read an article about this project

​

Watch some videos about this arena

bottom of page